1 "Part Submission Warrant
零件提交保证书"
2 "Appearance Approval Report
外观批准报告"
3 Engineering Drawing (Ballooned) 图纸
4 "Dimensional Results
尺寸检测报告"
5 Form 1411 or Equivalent (if required) 偏差报告
6 "Master Samples (6 pcs)
主样件"
7 Process Flow 过程流程图
8 Control Plan 控制计划
9 Design FMEA (if design responsible) 设计潜在失效模式
10 "Process FMEA
过程潜在失效模式"
11 "Capability Studies
能力分析"
12 "Gage R&R
检具分析"
13 "Material Cert. And Scope Accred.
材质证明及实验室资格证明"
14 "FMVSS Test and Scope Accred. (Flammability)
阻燃报告和实验室资格证明"
15 "Durability/Performance Tests
性能测试报告"
16 Run @ Rate Information (new parts only) GP9信息
17 Early Production Containment Plan (GP12) GP12控制计划