施工组织设计摘要翻译

2024-12-21 01:59:05
推荐回答(4个)
回答1:

The design section of Highway Construction, located in Yingkou City, Liaoning Province Economic and Technological Development Zone, east of Harbor Industrial Zone, starting with high-speed dial-phase, the end of Soul Mountain Road and the proposed phase. The construction organization design is for the highway project, in pre-construction site for the project itself, the specific characteristics and circumstances, in accordance with the engineering requirements, the required construction labor, construction materials, construction equipment and construction of temporary facilities, a scientific basis, well Comparison of preparation and reasonable arrangements set out in reasonable time and space for the construction of the strategic plan document. Main content including the preparation of the basis and principle, the project overview, construction Bushu, construction preparation, construction methods and measures of major projects, various promises measures, construction technology flow chart main content, compile targeted construction Zuzhisheji, Mei Gefen part of the project characteristics, structural features, construction schedule and quality requirements for the degree of difficulty, the preparation of the feasible construction plan, Yi Zhi Dao construction and successfully
Complete
the Project's Jianshe, control engineering Chengben, create high-quality project.
Key words: construction organization design; engineering characteristics; construction plan

回答2:

The design section of Highway Construction, located in Yingkou City, Liaoning Province Economic and Technological Development Zone, east of Harbor Industrial Zone, starting with high-speed dial-phase, the end of Soul Mountain Road and the proposed phase. The construction organization design is for the highway project, in pre-construction site for the project itself, the specific characteristics and circumstances, in accordance with the engineering requirements, the required construction labor, construction materials, construction equipment and construction of temporary facilities, a scientific basis, well Comparison of preparation and reasonable arrangements set out in reasonable time and space for the construction of the strategic plan document. Main content including the preparation of the basis and principle, the project overview, construction Bushu, construction preparation, construction methods and measures of major projects, various promises measures, construction technology flow chart main content, compile targeted construction Zuzhisheji, Mei Gefen part of the project characteristics, structural features, construction schedule and quality requirements for the degree of difficulty, the preparation of the feasible construction plan, Yi Zhi Dao construction and successfully 完成 the Project's Jianshe, control engineering Chengben, create high-quality project.
Key words: construction organization design; engineering characteristics; construction plan

回答3:

下一个翻译机器

回答4:

在线翻译不是很准确,上次我翻译了 没敢发
看你们的老师要求高不高了 高的话你找你们学校的外院同学翻译 要不花点钱也行